Difference between revisions of "Talk:Radical Nether Hub Redesign Proposal April 2016"

From This Land Wiki
Jump to: navigation, search
(Created page with "no mention of the suggestion to restandardise the network at y=8.5 (currently 13.5). This is kind of a big deal and should be included as an option in the proposal. pros of m...")
 
(Added heading)
Line 1: Line 1:
 +
==Suggestion to build the hub and new network lower down==
 
no mention of the suggestion to restandardise the network at y=8.5 (currently 13.5). This is kind of a big deal and should be included as an option in the proposal.
 
no mention of the suggestion to restandardise the network at y=8.5 (currently 13.5). This is kind of a big deal and should be included as an option in the proposal.
  

Revision as of 20:16, 4 April 2016

Suggestion to build the hub and new network lower down

no mention of the suggestion to restandardise the network at y=8.5 (currently 13.5). This is kind of a big deal and should be included as an option in the proposal.

pros of moving to y=8.5:

  • the existing nether network can be left pretty much as it is until we've finished the new one
  • eliminates the risk of tunnels encountering lava lakes

cons:

  • existing paths will not be on the same level, so they will have to be redone, or stairs will have to be used.
--fallerOfFalls, Extortionist (talk) pronouns: they/them/their/theirs/themself 19:37, 4 April 2016 (UTC)